Justin Stickler, M.S., RPA

Justin Stickler, M.S., RPA


Owner; Program Manager

Phone: 334.685.3354
E-mail: jstickler@wiregrassarch.com

Printable Resume

Selected Cultural Resources Projects

2014

  • Alabama SHPO Liaison: DWH MC252 Gulf Oil Spill (AHC/NPS): 2010-2014
  • Phase I CRAS (851-ac.) at Pelham Range (Thompson Engineering / FM-ARNGTC) Phase I CRAS
  • (2,000-ac.) at Talladega National Forest (USFS)
  • Phase I CRAS (1,760-ac.) at Talladega National Forest (USFS)
  • Thematic Study of the Town of Zula (FM-ARNGTC)
  • Fern Avenue Extension, Baldwin County, AL (Volkert, Inc.)
  • Phase I CRAS of Talladega College Improvements (Talladega College)
  • Phase I CRAS of Spanish Trail Industrial Park, Marianna, FL
  • Phase I CRAS of Bob Sikes Industrial Park, Crestview, FL

2013

  • Phase I CRAS (238-acre) at Talladega National Forest (USFS)
  • Phase I CRAS (5,531-acre) at Pelham Range, (REN Group / FM-ARNGTC: AL Army National
  • Guard) Archaeological Investigations at 1BA664, Orange Beach, Baldwin County, AL
  • (private client) Archaeological Investigations at Robinson Island, Orange Beach,
  • Baldwin Co, AL (Islands of Perdido Foundation)
  • Phase I CRAS of Cell Tower in Green County, MS (EBI Consulting)
  • After-the-fact Impact Assessment of the Joiner Tract, Baldwin County, AL (private client/USACE)

2012

  • Phase I CRAS (3,198-acre) at Pelham Range, (STOA / FM-ARNGTC: AL ARNG), Calhoun Co, AL
  • Phase II Site Evaluations (Ten sites) (JMR / Cane Creek Study, FM-ARNGTC), Calhoun Co, AL
  • Phase I CRAS of several borrow pits for AL DOT projects (APAC)

2011

  • Historic Properties Specialist Officer Representative, Eastern States (AL, FL, & MS)
  • (DWH MC252 Gulf Oil Spill, National Park Service)

2010

  • Phase I CRAS of several borrow pits for AL DOT projects (APAC)
  • Phase I Enon-Sehoy Plantation, Macon County (Enon-Sehoy Mitigation Bank, LLC)

2009

  • Phase I CRAS of Selma Riverfront Park, Dallas County (City of Selma)
  • Eglin Air Force Base Monitoring Project, Escambia Co, FL (CW Roberts, Inc.)
  • Pensacola Naval Air Station Monitoring Project, Escambia Co., FL (ESI)
  • Phase II Site Evaluation of 8JA1838 (Jackson County Chamber of Commerce)

2008

  • Archaeological Investigations of Fort Mitchell Trading Post, Russell Co, AL
  • (Russell County Historical Commission)
  • Phase II Site Evaluation of 1HO256 (Gilley Properties, LLC)
  • Phase I CRAS of City of Dothan Sanitary Sewer Line, Houston Co, AL (Barge Waggoner)

2007

  • Phase I CRAS of 1.5-mile Pine Tree Trail Corridor, Polk Co, FL (PBS&J/Polk Co Eng. Dept.)
  • Phase I CRAS of Broxton Bypass (US 441), Coffee Co, GA (PBS&J/GA DOT)
  • Phase I CRAS of a Proposed Ethanol Facility, Jackson Co, FL (Melvin Engineering)
  • Phase II Site Evaluation of 8WL2243 and 8WL2244 (Sembrera Holdings, LLC)
  • Archaeobotanical analysis of 8OK221 (Prentice Thomas & Associates)
  • Artifact Analysis of Landmark Park Collection, Dothan, AL (Landmark Park Foundation)

2006

  • Phase I CRAS of Crawfordville Highway (US 319), Wakulla Co, FL (PBS&J/FL DOT)
  • Phase I CRAS of SR73 from US 90 to US 231, Jackson Co, FL (PBS&J/FL DOT)
  • Phase I CRAS of Fallschase Development, Leon Co, FL (PBS&J)
  • Phase I CRAS of Ernie Caldwell Boulevard Corridor, Polk Co, FL (PBS&J)
  • Phase II Site Evaluation of NOTU Site (8BR1641), Cape Canaveral Air Station (PBS&J)

2005

  • Phase I CRAS of Bonfire Beach, Bay Co, FL (PBS&J/St. Joe Company)
  • Phase I CRAS of Proposed Timber Harvest Project, Pelham Range, Calhoun Co (ALARNG)
  • Numerous AL ARNG armory CRAS

2004

  • Master's Thesis: Plant Utilization at Fort Mitchell (1RU102), 1813-1840.
  • Numerous Phase I CRAS projects of AL ARNG armories

2001

  • Phase I CRAS Three Bridges in Houston Co, AL (Auburn University)
  • Phase III excavation of Fort Mitchell (1RU102) (Auburn University)